You’re in the commercial studio — back to homeowners →
SET SQUARE STUDIO 01202 934 044 Homeowners →
The completed Chicking restaurant at a prominent Bournemouth town-centre corner — glazed frontage and branded fascia

PROJECT / BOURNEMOUTH TOWN CENTRE

Empty shell to trading restaurant, on programme.

Appointed as design-and-build contractor to turn a raw shell on a prominent corner into a fully operational Chicking — one of the UK’s fastest-growing halal fried chicken brands. Every stage handled: planning, licensing, technical design and branded fit-out. Opened as planned.

Location
Bournemouth
Sector
F&B / Hospitality
Licences
2 granted
Delivery
On programme
01 — THE BRIEF

Turnkey: from bare walls to a trading date.

The client brief was clear and ambitious — take an empty shell unit and deliver a restaurant ready to trade, complete with every approval, consent and operating licence:

  • Planning permission for restaurant and takeaway use in a town-centre location
  • A late-night refreshment licence for trading beyond 23:00 — critical to the business model
  • A full commercial kitchen extraction and ventilation system
  • A complete branded interior fit-out to Chicking’s corporate design manual
  • Delivery on a tight programme aligned to the planned trading date
02 — THE HARD PART

A town-centre extraction problem that could have sunk the programme.

The most technically demanding element was the kitchen extraction: a town-centre building with limited roof access and neighbouring occupiers to protect. Our engineers produced a bespoke solution meeting planning conditions, Building Regulations Part F and environmental health requirements for odour control — resolving the classic planning stumbling block early, before it could cost weeks.

03 — HOW IT RAN

Planning and licensing, concurrently. We prepared the change-of-use application — addressing officer concerns on extraction discharge, shopfront design and streetscene — while coordinating the premises licence application in parallel. Running both processes at once, rather than one after the other, was central to holding the programme.

Brand-standard design. A full technical drawing set — layout, ceiling and lighting, joinery, finishes — developed with the Chicking brand team to their corporate manual.

Phased construction. Extraction and mechanical works ran concurrently with first fix, minimising float; all trades directly supervised by our site management, with regular client reporting.

04 — DELIVERED
  • Full planning consent — restaurant use, signage, fascia
  • Late-night refreshment licence — trading beyond 23:00
  • Bespoke commercial kitchen extraction, designed & installed
  • Complete branded fit-out, shell to trading
  • Building Regulations Part B, F & J sign-off
  • End-to-end programme & contractor management
05 — RESULT

Delivered on programme and to budget, opening to the public as planned with every consent in place before handover. The completed fit-out now serves as a reference project for the brand’s ongoing UK expansion.

One team, one contract, one programme — the risk and coordination burden lifted off the operator.